A technical memorandum in 2012 prepared by water/wastewater engineer West Yost Associates cited Public Works Financing data on municipally funded design-build-operate (DBO) projects that showed capital and O&M savings of 26% were achieved on 22 early DBO projects vs. design-bid-build project estimates.